Industrial facility DMC Brno Sokolnice
This project in Brno which we prepare can be delivered as a “turn-key” solution in accordance with client requirements. Once again the property will raise the bar of quality and sustainability of industrial buildings in Europe to the next, higher level by using photovoltaic panels, careful water management, etc. .
Size of the building is approx. 4 300sqm however the whole usable area can be extended up to 7 000sqm thanks to mezzanines.
We´re able to deliver this project as “built-to-suit” or “built-to-own”.