Industrial facility DMC Paskov

At DMC Paskov we have built a multifunctional logistics hall for ŠKODA AUTO, a.s. within the brownfield of the former Paskov Mine. The property with a size of approx. 8 330sqm including canopy for the expedition has been completed and handed over to the client in December 2022.

The construction has been carried out in accordance with the technical standard dmc construct 4.0, including several modifications according to the tenant’s specifications, such as a canopy for gitter boxes including loading ramps , the possibility of loading and unloading so-called gigaliners and preparation for charging trucks with electric drive. Among other things, we also supply a fast charging station for personal vehicles.

Thanks to its unique location, the property offers direct possibility of using the railway terminal AWT Paskov, a member of the multinational company PKP CARGO INTERNATIONAL, to which, in full operation, the tenant should have one unit train arriving and departing daily.

Financing of the project has been provided by UniCredit.

Tenant

Overview
0 m²
Available
8,330 m²
Built up area
0 m²
Expansion
8,330 m²
Total area

Address

739 21 Paskov

Park layout

List of Buildings

Available Building Layout